Advertisement

GUJARAT SOLAR ROOFTOP YOJANA

GUJARAT SOLAR ROOFTOP YOJANA




GUJARAT SOLAR ROOFTOP YOJANA


Guidelines For Implementation Of Policy For Development Of Small Scale Distributed Solar Projects 20121

Striking Features of plan for Residential Rooftop Solar Projects – 2018 - 19 


Plan will be under execution up to 31 st March, 2019 


Private buyer of any DISCOM, who is having private property in his name, is qualified to introduce sunlight based PV framework on his housetop from any one provider chose by him from the rundown of GEDA Empaneled Vendors. Rundown of these sellers is accessible on GEDA site www.geda.gujarat.gov.in 


Recipient will enroll their application through any of the GEDA enlisted affirmed empaneled merchant as it were. 


Close planetary system ought to be least of 1 kW limit. 


Recipient ought to have 100 sq.ft. shadow free region per kilowatt limit of close planetary system on their roof. Cost of the different limit Solar Rooftop PV framework found are as underneath;

    Sr. No.             System Capacity  Range                 Price discovered in Rs. Per Kilowatt 

                            1 to 6 kW                                             48,300/-- 

                              Above 6 to 10 kW                             48,000/-- 

                            Above 10 to 50 kW                             44,000/-- 

                            Above 50 kW                                     41,000/-- 

The framework cost referenced in above table is comprehensive of supply, establishment, dispatching, extensive upkeep agreement of 5 years of the total nearby planetary group, bi-directional meter and its testing charges, SMC box for the meter and the network charges to be paid to the DISCOM and standard construction needed to introduce sun based PV board on the housetop, with least surface freedom of 300 mm between the porch surface and the bottommost edge of the board. The expense of extra stature of the design required, assuming any, will be borne by the recipient. 


Some other charges to be paid to DISCOM , because of prerequisite of progress of stage if any from single to three stage, upgradation of the current power circulation organization , will be borne also by the recipient, as it is excluded from the found expense alluded in the table above. 


On the off chance that the Applicant is a solitary stage buyer of the DISCOM and expects to introduce a sun based rooftop top framework having limit which requires to change the period of his current help association from single stage to three stage, in such case the imperative charges for improvement of the stage from single to three stage will be borne by the purchaser being important for the framework fortifying, and excluded from the found expense per kW. 


Recipient will consent to availability arrangement with concerned DISCOM, according to the terms and conditions determined by the DISCOM. 


Banking of Energy is for one charging cycle for example age of the close planetary system is to be changed against the power drawn from the DISCOM in the power bill of that very month. 


Focal Government sponsorship of 30 % of the expense of the nearby planetary group according to the expense given in table and Government of Gujarat endowment of Rs.10,000/kW subject to limit of Rs.20,000 is given for private close planetary system. Detail of the housetop nearby planetary group is given in table beneath.

JOIN EDUCATION " WHATSAPP " GROUP

JOIN EDUCATIONAL "TELEGRAM" CHANNEL

System capacity 1 kW 2 kW 3 kW 4 kW 5 kW 6 kW 7 kW 8 kW 9 kW 10 kW 

Cost of solar system Rs. 48300 96600 144900 193200 241500 289800 336000 384000 432000 480000 Central Govt. Subsidy Rs. 14490 28980 43470 57960 72450 86940 100800 115200 129600 144000 

State Govt. Subsidy Rs. 10000 20000 20000 20000 20000 20000 20000 20000 20000 20000 

Cost to be borne customer Rs. 23810 47620 81430 115240 149050 182860 215200 248800 282400 316000 

Area Required 100 Sq.ft. 200 sq.ft. 300 sq.ft. 400 sq.ft. 500 sq.ft. 600 sq.ft. 700 sq.ft. 800 sq.ft. 900 sq.ft. 1000 sq.ft. 

YOU MAY LIKE THIS

GUJARAT YOJANA 

DAY SPECIAL QUIZ

DIGITAL GUJARAT DETAILS AND FACILITIES

SAVING SCEEME

 USEFULL APP

 Recipient will be needed to pay remaining/balance measure of the expense of the close planetary system to empaneled seller subsequent to deducting the measure of qualified appropriation , according to the terms and states of installment chose/concurred between the recipient and empaneled merchant. 


Recipient and Empaneled Vendor are needed to enter in to concurrence on Rs. 50/ - stamp paper according to the organization gave by GEDA to support of close planetary system for a very long time. The expense of understanding is to be borne by recipient. 


Endowment will be delivered by GEDA straightforwardly to the empaneled endless supply of the accompanying records ; a. Endorsement of the client that he has paid the financed cost of the close planetary system and approved GEDA to deliver the sponsorship to the empaneled merchant b. Nearby planetary group appointing report together endorsed by empaneled seller, recipient and DISCOM official c. Joint establishment report giving the detail of the framework introduced at site , endorsed by recipient and empaneled merchant d. Authentication for charging consent by CEI (for arrangement of in excess of 10 kW) OR testament of Electrical manager or worker for hire (for framework under 10 kW) 


Any enlisted limit of a sunlight based rooftop top task will not be qualified for establishment of + or - 5 % of the enrolled ability to cross the 6, 10 and 50 kW DC limit. 


The pace of appropriation will be relevant for the introduced DC limit of the sun based modules  The measure of endowment will be payable on the introduced kW DC limit of the sunlight based modules or limit of the kW invertor limit whichever is less.

JOIN EDUCATION " WHATSAPP " GROUP

JOIN EDUCATIONAL "TELEGRAM" CHANNEL

GUJARAT SOLAR ROOFTOP YOJANA

As endorsed by the equipped Authority of GUVNL, enrollment measure and other cycle are made simple under SURYA Gujarat conspire as under: 

1. Application Registration structure: 

Customer's Bank Account subtleties, Category and different conditions are joined. ln request to work on the application interaction following archives are should be transferred on gateway for application enrollment. I. Photograph (Required according to MNRE) ii. Aadhar Authentication (Required according to MNRE) 

iii. Home Tax receipt/Aakarni patrak/other Ownership archive Note: Electricity bill will be bring from DISCOM's LT Billing System. 

2. Alteration in system of Application Registration: There will be no Registration Deposit charge for application enrollment under SURYA Gujarat Scheme. Nonetheless, the F.Q charges towards Net metering cost, SMC cost, Meter testing Fee, availability charges and Network increase cost if any will be paid by purchaser as prevailinB standards. 

3. Decrease No. of Signatures of candidate in entire cycle up to framework appointing. ln request to limit buyer marks during measure, it is endorsed to get marks of customers on after records as it were. 

I. Application structure (l mark) 

ii. PPA understanding ( 2 No. of marks : first on first page and second on the last paSe) 

iii. Joint review report (1 No. of Signature - ideally of shopper or delegate with name and status of connection with buyer) iv. Meter Replacement Progorma-15 (1 No. of Signature-ideally of consumer^or delegate with name and status of connection with shopper)

GUJARAT SOLAR ROOFTOP YOJANA

AGENCY LIST PDF FILE


AProvisional Inter Connection Agreement Performa for Solar Rooftop Projects - Residential Category under SURYA Gujarat Scheme – 2020-21 w.e.f. 01-01-2021


DOWNLOAD FULL DETAILS BY GEDA CLICK HERE


PGVCL, DGVCL, MGVCL, UGVCL YOJANA FULL DETAILS & SITE


RELATED LINKS:- 

GOV. YOJANAO CLICK HERE

FARM IDEA CLICK HERE

EDUCATIONAL UPDATE CLICK HERE


Note: Plz always check and confirm the above details with the official website and Advertisement/ notification.

ALwAYS USE GOOGLE CHROME FOR BETTER RESULTS. 




Post a Comment

0 Comments